Frontier AI datacentre
Microsoft Fairwater Wisconsin
369 MW
Epoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source2.26 GW
Epoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026SourceMicrosoft Fairwater Wisconsin among the largest sites in the United States
| Site | Owner | Users | Country | Online now | Planned | Planned date |
|---|---|---|---|---|---|---|
| Microsoft Fairwater Wisconsin | Microsoft | OpenAI, Microsoft | United States | 369 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 2.26 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 13 May 2028 |
| Anthropic-Amazon New Carlisle | Amazon | Anthropic | United States | 910 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 1.93 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 17 Mar 2028 |
| OpenAI Stargate New Mexico | Oracle | OpenAI | United States | 0 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 1.75 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 31 Dec 2028 |
| Meta Hyperion | Meta | Meta | United States | 0 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 1.63 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 1 Jan 2028 |
| Colossus 2 | SpaceXAI | Anthropic, Cursor, SpaceXAI | United States | 946 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 1.53 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 25 Feb 2027 |
| OpenAI Stargate Shackelford | Oracle | OpenAI | United States | 0 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 1.40 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 11 Nov 2028 |
| QTS Cedar Rapids | Not stated | Not stated | United States | 0 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 1.13 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 15 Nov 2027 |
| Meta Prometheus | Meta | Meta | United States | 471 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 1.02 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source | 1 Jul 2028 |
Site details
- Owner
- Microsoft
- Users
- OpenAI, Microsoft
- Country
- United States
- IT power online now
- estimate at 15 May 2026
369 MW
Epoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source - Largest planned IT power
2.26 GW
Epoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source- Planned date
- 13 May 2028
Latest construction note
The main shell of Building 2 looks almost completed. In Area 2 (northwest of Buildings 1-2), the grading for the original design has been replaced with grading for the new 9-building design, making way fo
Note from Epoch AI, Frontier Data Centers (epoch.ai/data/data-centers) (CC BY 4.0).
Questions
Who owns Microsoft Fairwater Wisconsin?
Epoch AI's register lists Microsoft as the owner of Microsoft Fairwater Wisconsin, in the United States.
Who uses Microsoft Fairwater Wisconsin?
The register lists OpenAI, Microsoft as the users of the site.
How much power does Microsoft Fairwater Wisconsin have?
369 MW of IT power was online at the latest estimate in the register, against 2.26 GW planned, 16% of the plan (calculated). Snapshot of 14 Oct 2026.
When will Microsoft Fairwater Wisconsin be finished?
Epoch AI's timeline puts the site's largest planned IT power, 2.26 GW, at May 2028. Timelines are estimates and change as construction progresses.
Where does this datacentre data come from?
Epoch AI's Frontier Data Centers register (CC BY 4.0), which estimates each site's IT power over time from satellite imagery, permits and company statements. Figures are estimates, not company specifications.
Updated 14 Oct 2026. Source: Epoch AI, Frontier Data Centers (epoch.ai/data/data-centers) (CC BY 4.0). Estimates, not company specifications. Methodology: Pipeline Tracker. Not investment advice.