Microsoft Fairwater Wisconsin, owned by Microsoft and used by OpenAI, Microsoft, is a frontier AI datacentre in the United States with
369 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
of IT power online and
2.26 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
planned by May 2028. That is 16% of its planned capacity (calculated), per Epoch AI's register on 14 Oct 2026.

Microsoft Fairwater Wisconsin among the largest sites in the United States

IT power online now and planned
Microsoft Fairwater Wisconsin and comparable frontier AI datacentres, largest planned first
SiteOwnerUsersCountryOnline nowPlanned Planned date
Microsoft Fairwater WisconsinMicrosoftOpenAI, MicrosoftUnited States
369 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
est. at 15 May
2.26 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
13 May 2028
Anthropic-Amazon New CarlisleAmazonAnthropicUnited States
910 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
est. at 3 Jun
1.93 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
17 Mar 2028
OpenAI Stargate New MexicoOracleOpenAIUnited States
0 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
est. at 22 Jun
1.75 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
31 Dec 2028
Meta HyperionMetaMetaUnited States
0 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
est. at 19 Apr
1.63 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
1 Jan 2028
Colossus 2SpaceXAIAnthropic, Cursor, SpaceXAIUnited States
946 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
est. at 15 Jun
1.53 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
25 Feb 2027
OpenAI Stargate ShackelfordOracleOpenAIUnited States
0 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
est. at 4 Sep
1.40 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
11 Nov 2028
QTS Cedar RapidsNot statedNot statedUnited States
0 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
est. at 7 May
1.13 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
15 Nov 2027
Meta PrometheusMetaMetaUnited States
471 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
est. at 31 Aug
1.02 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
1 Jul 2028

Site details

Owner
Microsoft
Users
OpenAI, Microsoft
IT power online now
369 MWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
estimate at 15 May 2026
Largest planned IT power
2.26 GWEpoch AI Frontier Data Centers (CC BY 4.0)As of 14 Oct 2026Source
Planned date
13 May 2028

Latest construction note

The main shell of Building 2 looks almost completed. In Area 2 (northwest of Buildings 1-2), the grading for the original design has been replaced with grading for the new 9-building design, making way fo

Note from Epoch AI, Frontier Data Centers (epoch.ai/data/data-centers) (CC BY 4.0).

Questions

Who owns Microsoft Fairwater Wisconsin?

Epoch AI's register lists Microsoft as the owner of Microsoft Fairwater Wisconsin, in the United States.

Who uses Microsoft Fairwater Wisconsin?

The register lists OpenAI, Microsoft as the users of the site.

How much power does Microsoft Fairwater Wisconsin have?

369 MW of IT power was online at the latest estimate in the register, against 2.26 GW planned, 16% of the plan (calculated). Snapshot of 14 Oct 2026.

When will Microsoft Fairwater Wisconsin be finished?

Epoch AI's timeline puts the site's largest planned IT power, 2.26 GW, at May 2028. Timelines are estimates and change as construction progresses.

Where does this datacentre data come from?

Epoch AI's Frontier Data Centers register (CC BY 4.0), which estimates each site's IT power over time from satellite imagery, permits and company statements. Figures are estimates, not company specifications.

Updated 14 Oct 2026. Source: Epoch AI, Frontier Data Centers (epoch.ai/data/data-centers) (CC BY 4.0). Estimates, not company specifications. Methodology: Pipeline Tracker. Not investment advice.

Free · every trading day · 08:00 ET

Get the free 08:00 ET compute read by email, plus the AI Infrastructure Primer 2026.