DASHBOARDS · FIVE FREE, SEVEN FOR SUBSCRIBERS

The AI-infrastructure build-out, in live dashboards.

The big-4 hyperscalers spent
$201.9BSEC EDGAR 10-Q/10-K (XBRL): purchases of property and equipment, cash-flow statement (calc.)As of 30 Oct 2026Source
in cash capex in calendar Q3 2026,
+107.6%SEC EDGAR 10-Q/10-K (XBRL): purchases of property and equipment, cash-flow statement (calc.)As of 30 Oct 2026Source
y/y (calc.). Every chart is sourced and dated; the five below are free to everyone.

Big-4 hyperscaler cash capex (purchases of property and equipment, cash-flow statement), calendar Q3 2026methodology v1.0-rcn=430 Oct 2026method →

GPU price board · $/GPU-hour

As of 28 Nov 2026

Price per GPU-hour by accelerator, provider class and term, with each cell's state
GPUNeocloudHyperscaler listMarketplace & spotReserved, 1 yearReserved, 3 years
H100
$3.78Compute Terminal price board (public rate cards and marketplaces)As of 28 Nov 2026Source
n=16
$10.04Compute Terminal price board (public rate cards and marketplaces)As of 28 Nov 2026Source
4 of 4
$2.42Compute Terminal price board (public rate cards and marketplaces)As of 28 Nov 2026Source
n=10
Plus · 7-day trialPlus and Pron=7Plus · 7-day trialPlus and Proindicative · n=4
H200
$4.85Compute Terminal price board (public rate cards and marketplaces)As of 28 Nov 2026Source
n=14
$9.74Compute Terminal price board (public rate cards and marketplaces)As of 28 Nov 2026Source
4 of 4
$3.46Compute Terminal price board (public rate cards and marketplaces)As of 28 Nov 2026Source
n=10
Plus · 7-day trialPlus and Pron=7Plus · 7-day trialPlus and Proindicative · n=4
B200
$8.83Compute Terminal price board (public rate cards and marketplaces)As of 28 Nov 2026Source
n=10
$14.122 of 4
$5.46Compute Terminal price board (public rate cards and marketplaces)As of 28 Nov 2026Source
n=8
Plus · 7-day trialPlus and Proindicative · n=3Plus · 7-day trialPlus and Proindicative · n=3
B300
$9.22Compute Terminal price board (public rate cards and marketplaces)As of 28 Nov 2026Source
n=10
$16.402 of 4
$6.28Compute Terminal price board (public rate cards and marketplaces)As of 28 Nov 2026Source
n=6
Plus · 7-day trialPlus and Proindicative · n=4 · 1–2yPlus · 7-day trialPlus and Proindicative · n=2

n is the number of providers. Indicative cells are shown as they stand and are not in the index. Hyperscaler figures are list prices before discounts. Full price board →

Capex Supercycle Tracker

FREE

Quarterly capex, big-4 hyperscalers ($B)

  • Microsoft
  • Alphabet
  • Amazon
  • Meta Platforms
  • Derived from year-to-date filings
Microsoft Q2 '25: $17.1B (Q4 FY25), derived from year-to-date filingsAlphabet Q2 '25: $22.4B (Q2 FY25), derived from year-to-date filingsAmazon Q2 '25: $32.2B (Q2 FY25)Meta Platforms Q2 '25: $16.5B (Q2 FY25), derived from year-to-date filingsMicrosoft Q3 '25: $19.4B (Q1 FY26)Alphabet Q3 '25: $24.0B (Q3 FY25), derived from year-to-date filingsAmazon Q3 '25: $35.1B (Q3 FY25)Meta Platforms Q3 '25: $18.8B (Q3 FY25), derived from year-to-date filingsMicrosoft Q4 '25: $29.9B (Q2 FY26)Alphabet Q4 '25: $27.9B (Q4 FY25), derived from year-to-date filingsAmazon Q4 '25: $39.5B (Q4 FY25), derived from year-to-date filingsMeta Platforms Q4 '25: $21.4B (Q4 FY25), derived from year-to-date filingsMicrosoft Q1 '26: $30.9B (Q3 FY26)Alphabet Q1 '26: $35.7B (Q1 FY26)Amazon Q1 '26: $44.2B (Q1 FY26)Meta Platforms Q1 '26: $19.0B (Q1 FY26)Microsoft Q2 '26: $35.8B (Q4 FY26), derived from year-to-date filingsAlphabet Q2 '26: $44.9B (Q2 FY26), derived from year-to-date filingsAmazon Q2 '26: $54.2B (Q2 FY26)Meta Platforms Q2 '26: $30.1B (Q2 FY26), derived from year-to-date filingsMicrosoft Q3 '26: $39.4B (Q1 FY27)Alphabet Q3 '26: $51.4B (Q3 FY26), derived from year-to-date filingsAmazon Q3 '26: $77.3B (Q3 FY26)Meta Platforms Q3 '26: $33.9B (Q3 FY26), derived from year-to-date filings
Quarterly cash capex by company, calendar quarters, $ billions
QuarterMicrosoftAlphabetAmazonMeta PlatformsTotal
Q2 2025$17.1B (Q4 FY25), derived from year-to-date filings$22.4B (Q2 FY25), derived from year-to-date filings$32.2B (Q2 FY25)$16.5B (Q2 FY25), derived from year-to-date filings$88.2B
Q3 2025$19.4B (Q1 FY26)$24.0B (Q3 FY25), derived from year-to-date filings$35.1B (Q3 FY25)$18.8B (Q3 FY25), derived from year-to-date filings$97.3B
Q4 2025$29.9B (Q2 FY26)$27.9B (Q4 FY25), derived from year-to-date filings$39.5B (Q4 FY25), derived from year-to-date filings$21.4B (Q4 FY25), derived from year-to-date filings$118.6B
Q1 2026$30.9B (Q3 FY26)$35.7B (Q1 FY26)$44.2B (Q1 FY26)$19.0B (Q1 FY26)$129.8B
Q2 2026$35.8B (Q4 FY26), derived from year-to-date filings$44.9B (Q2 FY26), derived from year-to-date filings$54.2B (Q2 FY26)$30.1B (Q2 FY26), derived from year-to-date filings$165.1B
Q3 2026$39.4B (Q1 FY27)$51.4B (Q3 FY26), derived from year-to-date filings$77.3B (Q3 FY26)$33.9B (Q3 FY26), derived from year-to-date filings$201.9B

Data: SEC EDGAR XBRL company facts — company 10-Q and 10-K filings; latest quarter ended 30 Sep 2026; data as of 28 Nov 2026. Cash capex as each company defines it — Microsoft: Additions to property and equipment (cash; excludes assets acquired under finance leases); Alphabet: Purchases of property and equipment (cash); Amazon: Purchases of property and equipment (cash capex); Meta Platforms: Purchases of property and equipment (cash; excludes principal payments on finance leases). Calendar quarters: Microsoft's fiscal year ends in June (calendar Q3 2026 is its fiscal Q1 FY27), and its capex guidance is reported on an inconsistent calendar-versus-fiscal basis. Hatched segments are derived from year-to-date filings. Not investment advice.

Source: Compute Terminal AnalysisSEC EDGAR filingsMethodology v1.0-rcUpdated 28 Nov 2026, 12:39 UTC

2026 guidance vs spent

Cash capex spent in calendar Nine months 2026, by company (calc.)

  • MicrosoftSpent in Nine months 2026:
    $106.0BCalculated: Microsoft cash capex, calendar Q1 2026 + Q2 2026 + Q3 2026 (SEC EDGAR XBRL)As of 28 Nov 2026Source
  • AlphabetSpent in Nine months 2026:
    $132.0BCalculated: Alphabet cash capex, calendar Q1 2026 + Q2 2026 + Q3 2026 (SEC EDGAR XBRL)As of 28 Nov 2026Source
  • AmazonSpent in Nine months 2026:
    $175.7BCalculated: Amazon cash capex, calendar Q1 2026 + Q2 2026 + Q3 2026 (SEC EDGAR XBRL)As of 28 Nov 2026Source
  • Meta PlatformsSpent in Nine months 2026:
    $83.1BCalculated: Meta Platforms cash capex, calendar Q1 2026 + Q2 2026 + Q3 2026 (SEC EDGAR XBRL)As of 28 Nov 2026Source

Guidance ranges appear once the Q3 2026 calls (from late October) are entered in the register. Each range will be shown as given, with its fiscal-year basis stated: Microsoft's fiscal year ends in June and its guidance is reported on an inconsistent calendar-versus-fiscal basis.

Spent: calendar Q1 + Q2 + Q3 2026 cash capex from 10-Q and 10-K filings (SEC EDGAR XBRL company facts), summed (calc.); bars scaled to the largest spender; data as of 28 Nov 2026. Not investment advice.

Source: Compute Terminal AnalysisSEC EDGAR filingsMethodology v1.0-rcUpdated 28 Nov 2026, 12:39 UTC

The daily index email is included with Compute Open.

Compute Price Index

FREE

Advertised on-demand price per GPU-hour, weekly median ($)

Weekly median advertised on-demand price, $ per GPU-hour, by week starting
Week ofH100H200B200
24 Nov 2025$2.99$3.50$5.45
1 Dec 2025$2.99$3.50$5.45
8 Dec 2025$2.99$3.50$5.45
15 Dec 2025$2.99$3.50$5.45
22 Dec 2025$2.99$3.50$5.45
29 Dec 2025$2.99$3.50$5.42
5 Jan 2026$2.99$3.50$5.42
12 Jan 2026$2.99$3.50$5.42
19 Jan 2026$2.99$3.50$5.44
26 Jan 2026$2.99$3.50$5.44
2 Feb 2026$2.99$3.59$5.40
9 Feb 2026$2.98$3.55$5.32
16 Feb 2026$2.99$3.55$5.32
23 Feb 2026$2.96$3.50$5.50
2 Mar 2026$2.96$3.50$5.50
9 Mar 2026$2.93$3.50$5.50
16 Mar 2026$2.92$3.50$5.50
23 Mar 2026$2.94$3.50$5.50
30 Mar 2026$2.93$3.50$5.50
6 Apr 2026$2.93$3.50$5.25
13 Apr 2026$2.99$3.50$5.50
20 Apr 2026$2.99$3.50$5.49
27 Apr 2026$2.95$3.49$5.50
4 May 2026$2.99$3.50$5.50
11 May 2026$2.99$3.50$5.50
18 May 2026$2.99$3.79$5.50
25 May 2026$2.97$3.98$5.50
1 Jun 2026$3.00$4.00$6.11
8 Jun 2026$3.00$4.00$6.11
15 Jun 2026$2.99$4.29$6.67
22 Jun 2026$3.00$4.29$6.30
29 Jun 2026$3.07$4.29$6.11
6 Jul 2026$3.32$4.29$6.70
13 Jul 2026$3.08$4.11$6.25
20 Jul 2026$3.20$4.00$6.25
27 Jul 2026$3.36$4.29$6.19
3 Aug 2026$3.38$4.29$6.64
10 Aug 2026$3.37$4.47$6.37
17 Aug 2026$3.38$4.48$6.79
24 Aug 2026$3.37$4.38$6.37
31 Aug 2026$3.32$4.40$6.01
7 Sep 2026$3.34$4.40$6.25
14 Sep 2026$3.34$4.44$6.52
21 Sep 2026$3.38$4.44$6.49
28 Sep 2026$3.38$4.50$6.79
5 Oct 2026$3.49$4.63$6.79
12 Oct 2026$3.50$4.88$7.99
19 Oct 2026$3.72$5.00$7.99
26 Oct 2026$3.83$4.88$7.99
2 Nov 2026$3.94$5.00$8.01
9 Nov 2026$3.93$5.00$8.14
16 Nov 2026$3.97$4.90$8.19
23 Nov 2026$3.93$4.86$8.65
H100 · weekly median (GetDeploying)
$3.93GetDeploying GPU price dataset (CC BY 4.0)As of 28 Nov 2026Source
Week of 23 Nov 2026 · 48 providers
+31.4%Calculated: H100 weekly median, week of 2026-11-23 over week of 2025-11-24As of 28 Nov 2026Source
vs week of 24 Nov 2025 calc.
H200 · weekly median (GetDeploying)
$4.86GetDeploying GPU price dataset (CC BY 4.0)As of 28 Nov 2026Source
Week of 23 Nov 2026 · 39 providers
+39.0%Calculated: H200 weekly median, week of 2026-11-23 over week of 2025-11-24As of 28 Nov 2026Source
vs week of 24 Nov 2025 calc.
B200 · weekly median (GetDeploying)
$8.65GetDeploying GPU price dataset (CC BY 4.0)As of 28 Nov 2026Source
Week of 23 Nov 2026 · 26 providers
+58.8%Calculated: B200 weekly median, week of 2026-11-23 over week of 2025-11-24As of 28 Nov 2026Source
vs week of 24 Nov 2025 calc.

Advertised on-demand $ per GPU-hour, weekly median of provider medians (GetDeploying, CC BY 4.0)weekly mediann=4823 Nov 2026method →

H100 advertised weekly median $3.93 in the week of 23 Nov 2026, +31.4% on the week of 24 Nov 2025, across 48 providers. These are advertised prices, not transaction indices.

Data: GetDeploying, GPU rental price history, https://getdeploying.com/gpus, licensed under CC BY 4.0. Weekly median of provider median advertised on-demand prices, $ per GPU-hour; weekly medians compiled from the dataset, weeks of 24 Nov 2025 to 23 Nov 2026; data as of 28 Nov 2026. Advertised on-demand medians, not transaction indices; the latest week may still change. Convert any price into $m per MW-year with the price converter. Not investment advice.

Source: Compute Terminal AnalysisGetDeploying (CC BY 4.0)Methodology v1.0-rcUpdated 28 Nov 2026, 12:39 UTC

NVIDIA Pulse

FREE

Revenue by fiscal quarter ($B)

Total revenue as reported; Data Center segment revenue follows.

  • FY26
  • FY27
  • Derived from year-to-date filings
  • Percentages: change on the previous quarter
Q1 FY26: $44.1BQ2 FY26: $46.7BQ3 FY26: $57.0BQ4 FY26: $68.1B, derived from year-to-date filingsQ1 FY27: $81.6BQ2 FY27: $96.2B
NVIDIA total revenue by fiscal quarter, $ billions, with the change on the previous quarter
Fiscal quarterQuarter endedRevenueChange on previous quarter (calculated)
Q1 FY2627 Apr 2025$44.1BNo earlier quarter
Q2 FY2627 Jul 2025$46.7B+6.1%
Q3 FY2626 Oct 2025$57.0B+22.0%
Q4 FY2625 Jan 2026$68.1B, derived from year-to-date filings+19.5%
Q1 FY2726 Apr 2026$81.6B+19.8%
Q2 FY2726 Jul 2026$96.2B+17.9%
$96.2BSEC EDGAR 10-Q (XBRL)As of 28 Nov 2026Source
Q2 FY27 total revenue ·
+105.9%Calculated: NVIDIA total revenue, Q2 FY27 over Q2 FY26 (SEC EDGAR XBRL)As of 28 Nov 2026Source
on Q2 FY26 calc.
$150.49Exchange closesAs of 27 Nov 2026Source
NVDA close, 27 Nov 2026
+0.8%Exchange closesAs of 27 Nov 2026Source
1-day change
-19.3%Exchange closesAs of 27 Nov 2026Source
Year to date

Data: NVIDIA 10-Q and 10-K filings (SEC EDGAR XBRL) — latest: SEC EDGAR 10-Q (XBRL) for the quarter ended 26 Jul 2026; data as of 28 Nov 2026. Total revenue by fiscal quarter, as reported; Data Center segment revenue follows. Hatched quarters are derived from year-to-date filings. Quarter-on-quarter and year-on-year changes are calculated. Share price: exchange close of 27 Nov 2026. Not investment advice.

Source: Compute Terminal AnalysisSEC EDGAR filingsMethodology v1.0-rcUpdated 28 Nov 2026, 12:39 UTC

Gigawatt Race

FREE

Largest AI campuses: IT power online now vs planned

  • Online now
  • Largest planned
Largest AI campuses: IT power online now and largest planned IT power
CampusOwnerCountryOnline nowLargest plannedPlanned by
Microsoft Fairwater WisconsinMicrosoftUnited States369 MW2.26 GWMay 2028
Meta HyperionMetaUnited States0 MW2.06 GWDec 2029
Anthropic-Amazon New CarlisleAmazonUnited States1.04 GW1.93 GWMar 2028
Colossus 2SpaceXAIUnited States1.25 GW1.78 GWMar 2027
OpenAI Stargate New MexicoOracleUnited States0 MW1.75 GWDec 2028
OpenAI Stargate ShackelfordOracleUnited States0 MW1.40 GWNov 2028
QTS Cedar RapidsMetaUnited States0 MW1.13 GWNov 2027
Meta PrometheusMetaUnited States471 MW1.02 GWJul 2028
GoodnightGoogleUnited States0 MW1.01 GWOct 2027
OpenAI Stargate UAEG42United Arab Emirates0 MW1.00 GWJan 2028

Data: Epoch AI, Frontier Data Centers (epoch.ai/data/data-centers), licensed under CC BY 4.0; snapshot of 28 Nov 2026. IT power online now versus the largest planned IT power in the timeline (MW). Epoch AI estimates from satellite imagery, permits and disclosures, not company specifications. The 10 campuses shown are the largest by planned IT power of the 99 in the dataset. Full register in the Datacentre Monitor. Not investment advice.

Source: Compute Terminal AnalysisEpoch AI (CC BY 4.0)Methodology v1.0-rcUpdated 28 Nov 2026, 12:39 UTC

Neocloud Scoreboard

FREE HEADLINES · FULL IN STANDARD
Neocloud headlines: latest quarterly revenue, share price and latest news
Company · tickerLatest quarterly revenue · change on a year earlierShare price · YTDLatest news
CoreWeaveCRWV
$3.7BSEC EDGAR 10-Q (XBRL)As of 22 Nov 2026Source
+168.2%Calculated: CoreWeave total revenue, Q3 FY26 over the same quarter a year earlier, both from SEC EDGAR XBRLAs of 22 Nov 2026Source
y/y
Q3 FY26 · quarter to 30 Sep 2026
$44.15Exchange closesAs of 27 Nov 2026Source
YTD
-38.3%Exchange closesAs of 27 Nov 2026Source
Close 27 Nov 2026
Morgan Stanley and MUFG prepare to seek investors for a $4.5bn CoreWeave loan to buy GPUs26 Nov 2026single source
Nebius GroupNBIS
$981MNebius Group Form 6-K of 2026-11-12, entered by hand from the filingAs of 27 Nov 2026Source
+571.3%Calculated: Nebius Group total revenue, Q3 FY26 over the same quarter a year earlier, both from the company's Form 6-K, entered by handAs of 27 Nov 2026Source
y/y
Includes
$325MNebius Group Form 6-K of 2026-11-12, entered by hand from the filingAs of 27 Nov 2026Source
of revenue from strategic partnerships, which the company’s 6-K describes as non-recurring.
Q3 FY26 · quarter to 30 Sep 2026 · from the company's Form 6-K
$89.46Exchange closesAs of 27 Nov 2026Source
YTD
+6.9%Exchange closesAs of 27 Nov 2026Source
Close 27 Nov 2026
Nebius extends Israel data centre lease with Mega Or by 134MW20 Nov 2026single source
IREN
$228MSEC EDGAR 10-Q (XBRL)As of 22 Nov 2026Source
-5%Calculated: IREN total revenue, Q1 FY27 over the same quarter a year earlier, both from SEC EDGAR XBRLAs of 22 Nov 2026Source
y/y
AI Cloud revenue
$200MSEC EDGAR 10-Q (XBRL)As of 28 Nov 2026Source
, from
$7MSEC EDGAR 10-Q (XBRL)As of 28 Nov 2026Source
a year earlier
Q1 FY27 · quarter to 30 Sep 2026
$13.61Exchange closesAs of 27 Nov 2026Source
YTD
-64.0%Exchange closesAs of 27 Nov 2026Source
Close 27 Nov 2026
IREN expects roughly $15 billion of capex this fiscal year while building 200MW in Texas for Microsoft6 Nov 2026single source

The full scoreboard, with Lambda, Crusoe, Nscale and the miner converts, is included with Standard, Plus and Pro.

The full scoreboard, with Lambda, Crusoe, Nscale and the miner converts, is in Standard and above.

See plansSign in

Sources: total revenue as filed, latest reported quarter, from company 10-Q and 10-K filings (SEC EDGAR XBRL); for a foreign private issuer, which files no quarterly XBRL, from its Form 6-K, entered by hand and linked to the filing. y/y against the same quarter a year earlier, read from the same line of the filings (calc.); filings data as of 27 Nov 2026. Share prices: exchange closes of 27 Nov 2026. Headlines are our own summaries from the news register. Not investment advice.

The full suite: twelve dashboards

Five free dashboards for everyone; seven more for subscribers, each built on one of the eleven instruments.

The twelve dashboards, the plan that includes each, what it shows and who it is for
DashboardPlanWhat it showsFor
Capex Supercycle TrackerFreeBig-4 hyperscaler capex by quarter against 2026 guidanceEveryone
Compute Price IndexFreeWhat an H100, H200 or B200 hour costs this weekBuyers, suppliers, investors
NVIDIA PulseFreeRevenue by fiscal quarter and the share-price snapshot; Data Center segment revenue to followInvestors, suppliers
Gigawatt RaceFreeThe biggest AI campuses, online vs plannedEveryone
Neocloud ScoreboardFree / StandardRevenue, backlog and power across listed and private GPU cloudsInvestors, buyers, lenders
Global AI Factory PipelinePlusEvery 100 MW+ project worldwide by stage, with a country league tableDevelopers, EPCs, suppliers
Power & Grid MonitorPlusInterconnection queues, large-load tariffs, PPA prices and equipment lead timesDevelopers, utilities, EPCs
Silicon Supply Chain HeatmapPlusAdvanced packaging, HBM and memory pricing, accelerator shipmentsSuppliers, investors
Token Economics MonitorPlusAPI price per million tokens against GPU-hour costCompute buyers, investors
Credit & Funding TrackerPlusFunding-cost ladder, maturity wall and contract cover of debtLenders, credit investors
Backlog & Contract LedgerProWho owes whom across hyperscalers, neoclouds and AI labsFunds, lenders, advisers
AI-Factory Unit Economics LabProBuild cost per MW, GPU-hour price, utilisation and power price into payback and IRRDevelopers, lenders, funds

The daily index email is included with Compute Open.

Free · every trading day · 08:00 ET

Get the CTI Compute Cost Index free in your inbox every morning.

By continuing you agree to the Terms of Subscription and the Terms of Use.

Get the CTI Compute Cost Index free in your inbox every morning.

By continuing you agree to the Terms of Subscription and the Terms of Use.