Instrument 11 · monthly
Build Cost & Lead-Time Index
What it costs and how long it takes to build AI capacity: all-in cost per MW by market and design class, the liquid-cooling premium, lead times for transformers, switchgear, breakers and gas turbines, construction-labour indicators and the month's contract awards to EPC firms and builders. Built for contractors, equipment suppliers and developers as much as investors.
Headline readings are public to every visitor and may be reused under CC BY 4.0 with the credit “Source: Compute Terminal” and a link to this page.
- CADENCE
- Monthly
- INPUTS
- Broker and engineering cost studies, OEM and utility disclosures, contract-award register, labour statistics
- OUTPUT
- Cost per MW by market, lead-time series, labour gauge, award log
- ACCESS
- Headline public monthly; series Plus; data Pro
Method
- Cost studies are stored with their scope (market, design class, what is included) and never blended across scopes.
Caveats
- Cost studies differ in scope; each figure carries its definition.
Revision log
No method changes since launch.
Every change to this method will be dated and recorded here.
Methodology published by Compute Terminal. Compute Terminal indices and readings are published for information. They are not benchmarks for the purposes of the UK or EU Benchmarks Regulation and may not be used as a reference in a financial instrument or financial contract, or to measure the performance of an investment fund, without a written licence from the publisher. Not investment advice.